Skip to content

深明顧問有限公司 Environmental & Tech Consultants

Environmental, Noise, BEAM & IT Consultants HK

  • About
    • Careers
  • Environmental
    • – BEAM Plus Consultants
    • – IEC Independent Environmental Checker
    • – QPME Label: Apply or Renew
    • – Environmental Design
    • – Noise Permits / Emission Labels
    • – Acoustic, Noise & Vibration Consultants
    • – Aircraft Noise AEDT Consultants
    • – ESG Reporting / Data
    • – Sustainability Advisory
    • – Science Based Targets Advisory
  • Digital
    • – BIM and GIS
    • – Continuous Noise Monitoring System
    • – Soundscape Design by Big Data
    • – 3D EIA
    • – Multi-channel System
    • – Apply CNP
  • Projects
  • Job Ad
  • Contact

independent environmental checker

IEC for Lok Wo Sha Phase 2

IEC for Lok Wo Sha Phase 2

IEC for Explosive Magazine Tai Shu Ha

IEC for Explosive Magazine Tai Shu Ha

Lok Chui Street Sewage Pumping Station LOK CHUI STREET SEWAGE PUMPING STATION

Lok Chui Street Sewage Pumping Station

IEC for Road Improvement Works for West Kowloon Reclamation Development

IEC for Road Improvement Works for West Kowloon Reclamation Development

IEC for WHS Crematorium

IEC for WHS Crematorium

IEC for Road T3 & Associated Roadworks

IEC for Road T3 & Associated Roadworks

Tseung Kwan O – Lam Tin Tunnel (TKO-LTT)

Tseung Kwan O – Lam Tin Tunnel (TKO-LTT)

IEC for Kai Tak Development Stage 3A anewr iec cedd kai tak

IEC for Kai Tak Development Stage 3A

IEC for Site Formation and Infrastructural Works in Area 54, Tuen Mun anewr iec

IEC for Site Formation and Infrastructural Works in Area 54, Tuen Mun

IEC for SWHSTW Further Expansion Phase 1A anewr iec shek wu hui dsd

IEC for SWHSTW Further Expansion Phase 1A

  • Linkedin
  • Youtube
Create a website or blog at WordPress.com
深明顧問有限公司 Environmental & Tech Consultants
Create a website or blog at WordPress.com
Cancel