
Vibration and Noise Monitoring for Hotel and Office Extension at Hung Hom
ANewR provides real-time continuous vibration and noise monitoring services for the existing hotel and office building at Hung Hom in order to ensure the extension works of the existing hotel of office building would not impose any vibration and noise impacts to the existing tenants, especially the data centres in the existing office building.

IEC for SWHSTW Further Expansion Phase 1A
ANewR is the Independent Environmental Checker for the Advance Works for SWHSTW Further Expansion Phase 1A. The works is to increase the treatment capacity of SWHSTW with tertiary treatment level, with suitable allowance to cater for a further increase of treatment capacity in Phase 1B. ANewR Consulting has been commissioned to undertake regular environmental site audits,Continue reading “IEC for SWHSTW Further Expansion Phase 1A”

IEC for Site Formation and Infrastructural Works in Area 54, Tuen Mun
The works contract covers formation works of 7.4 hectares of land, construction of new local distributor roads and associated infrastructural works. ANewR provides independent environmental checking and auditing services to ensure the environmental monitoring programme and mitigation measures implemented properly.

IEC for Kai Tak Development Stage 3A
Stage 3A infrastructure at former north apron area include a new distributor road serving the planned Kai Tak Development. ANewR Consulting has been commissioned to undertake independent environmental checking and auditing the environmental performance of the contractor and its environmental team against requirements stipulated in the Environmental Permit, EIA Report and EM&A Manual.

Noise Monitoring for Expansion of Beas River Equestrian Centre of HKJC
ANewR was commissioned to provide automatic continuous noise monitoring services during the construction phase of expansion of Beas River Equestrian Centre (BREC) of The Hong Kong Jockey Club. The expansion works requires noise control so as to allow daily horse riding and practicing activities to continue effectively without major interference at sensitive locations and eliminateContinue reading “Noise Monitoring for Expansion of Beas River Equestrian Centre of HKJC”

BEAM Plus for VTC Proposed Student Dormitory at IVE
ANewR is the BEAM Plus consultant of the main contractor, Chinney, of the Project. We assist Chinney implementing green practices in building construction in order to achieve BEAM Plus credit requirements of various aspects including site aspect, material aspect, energy use, water use and indoor environmental quality. We have also carried out environmental studies forContinue reading “BEAM Plus for VTC Proposed Student Dormitory at IVE”

Tseung Kwan O – Lam Tin Tunnel (TKO-LTT)
To cope with the increasing population in Tseung Kwan O District and the associated demanding traffic loading, the Tseung Kwan O – Lam Tin Tunnel (TKO-LTT) is constructed as a dual two-lane highway connecting TKO in the east with Eastern Harbour Crossing and Cha Kwo Ling Road of Kwun Tong in the west, aiming to improve the trafficContinue reading “Tseung Kwan O – Lam Tin Tunnel (TKO-LTT)”

IEC for Road T3 & Associated Roadworks
ANewR is the Independent Environmental Checker for the remaining works of Road T3 & Associated Roadworks. The remaining works covers construction of an outstanding 1-lane slip road connecting Tai Po Road – Sha Tin Section with Tsing Sha Highway. ANewR Consulting has been commissioned to undertake regular environmental site audits, and review and verification ofContinue reading “IEC for Road T3 & Associated Roadworks”

IEC for WHS Crematorium
The Food and Environmental Hygiene Department demolished the five old cremators at Wo Hop Shek Crematorium which were approaching the end of their serviceable life and construct in-situ a new crematorium in the same site in this Project. ANewR was appointed as the Independent Environmental Checker for the construction phase of the Project. ANewR ConsultingContinue reading “IEC for WHS Crematorium”

IEC for Road Improvement Works for West Kowloon Reclamation Development
There are total of 4 Schemes of road improvement works in West Kowloon reclamation areas to be undertaken in this Project. Road works include construction of elevated roads, new carriage, underpass and junction improvement works. ANewR is appointed by HyD to the be independent environmental checker of the Project. ANewR Consulting has been commissioned toContinue reading “IEC for Road Improvement Works for West Kowloon Reclamation Development”

Lok Chui Street Sewage Pumping Station
ANewR is the Independent Environmental Checker for the construction of Lok Chui Street Sewage Pumping Station. The construction works is part of the DSD’s works contract DC/2014/01 Castle Peak Road Trunk Sewer and Tuen Mun Village Sewerage. ANewR Consulting has been commissioned to undertake regular environmental site audits, and review and verification of EM&A reportsContinue reading “Lok Chui Street Sewage Pumping Station”

CNP Application for Station Improvement Works at MOK Station
ANewR is the noise consultant for the contractor of the station improvement works. We carried out in-situ noise measurements to study the sound attenuation property inside the MTR station and noise reduction performance of the acoustic enclosure in supporting of the CNP application for night works. With our advice on the application strategy and technicalContinue reading “CNP Application for Station Improvement Works at MOK Station”

Noise Measurement Service Inside Passenger Trains in MTR Network
ANewR is the term contractor of MTR Corporation for providing noise measurement services for passenger trains in MTR Network. We carried out regular measurements for 8 existing railway lines and ad hoc measurements for 2 railway lines including Kwun Tong Extension Line (KTE) and South Island Line (SIL). During the measurements, tachometer is required toContinue reading “Noise Measurement Service Inside Passenger Trains in MTR Network”

IEC for Explosive Magazine Tai Shu Ha
ANewR is the Independent Environmental Checker for the operation of the Tai Lam Explosives Magazine (TLEM) at Tai Shu Ha. The TLEM is used for storage of explosives for tunnel works of CEDD Contract CV/2012/08 Liantang/Heung Yuen Wai Boundary Control Point and Associated Works Contract 2 and being operated by Dragages. ANewR Consulting has beenContinue reading “IEC for Explosive Magazine Tai Shu Ha”

IEC for Lok Wo Sha Phase 2
Construction works of Lok Wo Sha Phase 2 comprises the widening of Yiu Sha Road; construction of a covered footbridge with lift; construction of a new sewage pumping station and ancillary works. ANewR is appointed by CEDD to be the independent environmental checker of the Project. ANewR Consulting has been commissioned to undertake regular environmentalContinue reading “IEC for Lok Wo Sha Phase 2”

San Tin Highway
ANewR Environmental Consultants were commissioned to undertake an environmental review for the retrofitting of noise barriers on San Tin Highway for Highways Department (HyD).

Noise Measurement for QPME
ANewR Environmental Consultants were commissioned to study the noise performance of various Quality Powered Mechanical Equipment (QPME) items including: generators excavators handheld breakers A detailed review of the noise levels of the existing QPME items was undertaken by comparing the noise levels (SWL) determined by measurement methods as required under (i) Ministry of Land, Infrastructure,Continue reading “Noise Measurement for QPME”

Construction Noise Permit CNP Application for Kowloon Tong Station
ANEWR was commissioned to perform measurement to determine how the noise levels attenuate against distance from the source within the station, the methodology was discussed amongst EPD, MTR and us to estimate the noise levels at the station exits from the works sites within the station, then determine the noise level at NSRs.

TKO seawater desalination plant
ANEWR has been awarded a services contract by the Water Supplies Department (WSD) of the Hong Kong Special Administrative Region to construct the First Stage of Tseung Kwan O seawater desalination plant at Area 137, with a water production capacity at 135,000 cubic metres per day, using reverse osmosis. ANEWR will provide Independent Environmental CheckerContinue reading “TKO seawater desalination plant”

Expansion of Sha Tau Kok Sewage Treatment Works
ANEWR has been awarded a services contract by the Drainage Services Department (DSD) of the Hong Kong Special Administrative Region to take part in the Expansion of Sha Tau Kok Sewage Treatment Works (STKSTW), Phase 1, from 1,660 m³/day to 5,000 m³/day and provide allowance to facilitate a further increase to 10,000 m³/day. ANEWR willContinue reading “Expansion of Sha Tau Kok Sewage Treatment Works”

Tung Chung New Town Extension
ANEWR was commissioned as the environmental consultants to assess the potential impacts of the Deep Cement Mixing (DCM) processes being used in the Tung Chung New Town Extension project. The reclamation and advance works at Tung Chung East are the main part of Tung Chung New Town extension project, providing 40 000 new flats toContinue reading “Tung Chung New Town Extension”

New Wang Tong River Bridge
Keep on partaking in public works, #ANewR has been appointed by the Highways Department to provide independent environmental checking services for their new bridge project. Amid the #pandemics, we all had to wear facial #masks at the agreement-signing ceremony. We were smiling behind the masks – Cheers!

The Preliminary Environmental Review for Football-cum-Rugby Pitch with Public Vehicle Park
ANewR is excited to be awarded to launch the Preliminary Environmental Review for Football-cum-Rugby Pitch with Public Vehicle Park.

Training environmental professionals at Environment Academy
ANewR has been assigned to design and set up the 4-dimensional virtual reality training classroom for the Environmental Protection Department (EPD) of HKSAR to conduct authentic noise reduction training for the EPD staff. To learn more, please view the video at https://youtu.be/YJfGvfmMfNU.

Independent Environmental Checker for Lei Yue Mun Waterfront Enhancement Project
A revitalisation project aiming to improve the Lei Yue Min waterfront facilities mainly includes constructing a public landing facility, a breakwater, a waterfront promenade, lookout point improvement, and viewing platform construction. ANewR is appointed as Independent Environmental Checker to ensure compliance with the conditions and requirements of the EM&A Manual and to provide environmental adviceContinue reading “Independent Environmental Checker for Lei Yue Mun Waterfront Enhancement Project”

Independent Environmental Checker for Site Formation and Infrastructure Works near Tsz Tin Road and Hing Fu Street in Area 54, Tuen Mun
A housing development project in Tune Mun, Hong Kong, consists of site formation for public housing, government, institution or community and construction of associated infrastructure works – roads and footpath, slope works and landscape works, waterworks, sewerage works and drainage works, as well as noise mitigation measures. ANewR is assigned to verify and audit theContinue reading “Independent Environmental Checker for Site Formation and Infrastructure Works near Tsz Tin Road and Hing Fu Street in Area 54, Tuen Mun”

Public promotional program for Quiet Renovation Hand Tools
ANewR is appointed to establish a promotional program under this contract for easy reference on good house rules and quiet renovation methods. We contribute our expertise on noise assessment on home renovation tools, management and technical guidelines establishment, public engagement tactics, event organisation and management, as well as social inclusion tools, i.e. the website (www.quietrenovation.com).

Provision of Services for Development and Maintenance of an Integrated Environmental Monitoring and Audit Visualisation Platform
An integrated EM&A visualisation platform for construction of infrastructure project near Shek Kwu Chau is to manage and analyse the considerable amount of monitoring data and relevant information. ANewR is appointed to design and develop a one-stop 3D visualisation platform to integrate and consolidate various data sources into one platform, including CCTV live streaming. AlertContinue reading “Provision of Services for Development and Maintenance of an Integrated Environmental Monitoring and Audit Visualisation Platform”

Development and Establishment of Green Event Alliance Platform and Project’s Website for The Recycling Fund Industry Support Programme
The Green Event Alliance Platform is to foster the green event culture. Interactive interphase and graphics are adapted to provide navigatable content. ANewR partakes the design, development, and delivery: website to present information such as latest news, advertisement; web modules and verification functions; event enrolment, application, quotation management, report generation; automatic calculation of carbon footprintContinue reading “Development and Establishment of Green Event Alliance Platform and Project’s Website for The Recycling Fund Industry Support Programme”

Pedestrian Connectivity for Grantham Hospital – Feasibility Study
The Southern District Council of HKSAR proposes a footbridge construction connecting Mass Transit Railways to the Grantham Hospital. ANewR is engaged to provide and prepare the following for the project: Preliminary environmental review report; Sustainability assessment report; Option evaluation and assessment report; Engineering feasibility study report.

Renewal of the Existing QPME Labels for On-wagon Generators in SIL
The task is to renew the existing QPME (Quality Powered Mechanical Equipment ) labels for on-wagon generators in SIL. Including the validation, issuance, and submission of the Noise Measurement Report and Maintenance Record Checklist will be provided to EPD for renewal purposes. ANewR will provide services of: Provision of Competent acoustical professional; Conduct and validateContinue reading “Renewal of the Existing QPME Labels for On-wagon Generators in SIL”

ArcGIS Display in Cave by using ArcGIS Unity Module
ANewR is appointed to perform the following tasks for our global market leader client in GIS : Map the 3D scenes to CAVE projection system; Scene camera control by keyboard and mouse, or iPad; The user interface for loading the scene/base map; The user interface to load layers; The user interface to control the visibilitiesContinue reading “ArcGIS Display in Cave by using ArcGIS Unity Module”

Noise Consultancy Services in Support of Renewal of Quality Powered Mechanical Equipment (QPME) Labels for Generator
Possessing a qualified member of the Hong Kong Institute of Acoustics (HKIOA), ANewR is designated to support the Renewal of Quality Powered Mechanical Equipment Label (QPME Label) for generators. We will provide consultancy services, including in-situ noise measurements, preparation of noise reports validated by HKIOA members, and provision of Registered Professional Engineer (RPE) endorsement ofContinue reading “Noise Consultancy Services in Support of Renewal of Quality Powered Mechanical Equipment (QPME) Labels for Generator”

Web app and database generation for Hazard Assessment
ANewR carries out the following tasks for our client: Database generations for specific locations; Individual Risk Contours; Demonstrate the correlation information/data between each contour.

Air quality sampling and testing services for Zinc Alloy manufacturing factory
ANewR provides air quality sampling and testing services for zinc alloy manufacturing factory with the following tasks: To conduct 2 sets of stack sampling at exhaust point of the existing and planned zinc alloy manufacturing process lines and lab testing to evaluate the air pollutant concentration and emission rate; To manage and supervise the samplingContinue reading “Air quality sampling and testing services for Zinc Alloy manufacturing factory”

Engineering consultancy service
ANewR is assigned to: determine the potential road traffic noise impacts on the proposed development/redevelopment and to recommend mitigation measures Road Traffic Noise Assessment Fixed Noise Sources Assessment determine the potential transport facility noise impacts and to recommend mitigation measures Transport Facility Noise Assessment determine the potential rail noise impacts and to recommend mitigation measuresContinue reading “Engineering consultancy service”

Saloon Noise measurement for railway lines
ANewR conducts saloon noise measurement for railway line simultaneously with the measurement of Ambient Saloon Noise Measurement for motor cars and trailer cars. We are to: set up sound level meters in trains, above the saloon floor; carry out saloon noise measurement; log the noise data for all events of the train running during theContinue reading “Saloon Noise measurement for railway lines”
Copyright © 2022 ANEWR Consulting Limited