Independent Environmental Checker

Construction siteIn Hong Kong, the Environmental Impact Assessment Ordinance (EIAO) requires, depending on nature and complexity, certain Designated Projects (DP) to engage an Independent Environmental Checker (IEC) to audit their overall environmental performance.

ANewR provides IEC services in an independent, objective and professional manner to audit the environmental performance of any DP EM&A during the construction, operation and/or decommissioning phases.

Our relevant projects include:

  • IEC for Contract No. CV/2015/03 Site Formation and Infrastructural Works near Tong Hang Road and Tsz Tin Road in Area 54, Tuen Mun for CEDD
  • IEC for Tseung Kwan O – Lam Tin Tunnel for CEDD
  • IEC for Explosives Magazine at Tai Shu Ha for Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 2 Consultancy Agreement No. CV/2012/08-CA031 for CEDD
  • IEC for Construction of Lok Chui Street Sewage Pumping Station for DSD
  • IEC for Ma On Shan Development – Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha, Phase 2 for CEDD
  • IEC for Road Improvement Works for West Kowloon Reclamation Development for HyD
  • IEC for Advance Works for Shek Wu Hui Sewage Treatment Works Further Expansion Phase 1A for DSD
  • IEC for Sha Tin New Town, Stage II – Road T3 and Associated Roadworks (Construction and Operation Stages) for CEDD
  • IEC for Contract No. KL/2012/02 Kai Tak Development – Stage 3A infrastructure at Former North Apron Area for CEDD
  • IEC for Reprovisioning of Cremators at Wo Hop Shek Crematorium for ArchSD

  • IEC for Contract No. KL/2010/03 Kai Tak Development – Stage 2 Infrastructure Works at North Apron Area of Kai Tak Airport for Residential Development and Government Facilities for CEDD
  • IEC for Reprovisioning of Cape Collinson Crematorium for ArchSD
  • IEC for Ma On Shan Development – Roads, Drainage and Sewerage Works at Whitehead and Lok Wo Sha, Phase 1 for CEDD