Skip to content

深明顧問有限公司 Environmental & Tech Consultants

Environmental, Noise, BEAM & IT Consultants HK

  • About
    • Careers
  • Environmental
    • – BEAM Plus Consultants
    • – IEC Independent Environmental Checker
    • – QPME Label: Apply or Renew
    • – Environmental Design
    • – Noise Permits / Emission Labels
    • – Acoustic, Noise & Vibration Consultants
    • – Aircraft Noise AEDT Consultants
    • – ESG Reporting / Data
    • – Sustainability Advisory
    • – Science Based Targets Advisory
  • Digital
    • – BIM and GIS
    • – Continuous Noise Monitoring System
    • – Soundscape Design by Big Data
    • – 3D EIA
    • – Multi-channel System
    • – Apply CNP
  • Projects
  • Job Ad
  • Contact
  • anewr-highways-environmental-project

    New Wang Tong River Bridge

    October 17, 2020October 17, 2020 | rachelanewr
  • ANewR Environmental Consultants Asia 3

    TKO seawater desalination plant

    March 3, 2020October 17, 2020 | rachelanewr
What technology has been used in training environmental professionals at Environment Academy in Hong Kong what tech has been used in epd academy

What technology has been used in training environmental professionals at Environment Academy in Hong Kong

The Preliminary Environmental Review for Football-cum-Rugby Pitch with Public Vehicle Park

The Preliminary Environmental Review for Football-cum-Rugby Pitch with Public Vehicle Park

New Wang Tong River Bridge anewr-highways-environmental-project

New Wang Tong River Bridge

Tung Chung New Town Extension Aerial View of Tung Chung Reclamation Site_1

Tung Chung New Town Extension

Expansion of Sha Tau Kok Sewage Treatment Works IEC for Sha Tau Kok Sewage Treatment Works

Expansion of Sha Tau Kok Sewage Treatment Works

VTC Halls of Residence (Tsing Yi) residence hall vtc tsing yi

VTC Halls of Residence (Tsing Yi)

TKO seawater desalination plant ANewR Environmental Consultants Asia 3

TKO seawater desalination plant

Noise Impact Assessment for Proposed Barge Berth North of Container Terminal 9 Noise Impact Assessment for Proposed Barge Berth North of Container Terminal 9

Noise Impact Assessment for Proposed Barge Berth North of Container Terminal 9

Construction Noise Permit CNP Application for Kowloon Tong Station Noise Consultancy Services of CNP Application for Kowloon Tong Station

Construction Noise Permit CNP Application for Kowloon Tong Station

Posts navigation

Previous
  • Linkedin
  • Youtube
Create a website or blog at WordPress.com